Location: International Shores
Completed in 2016, the Lakeshore Park Project includes a water overlook, a restroom, an alleĆ© of Mexican Sycamore trees, and exercise equipment with rubberized surfacing. The plan for this plaza, located at the southeast entrance of The Boardwalk, was included in TTCās (then TTFās) Southeast Shore Park and Trail Masterplan.Ā
Construction of the water overlook, restroom, and landscape architecture was completed in 2014 with the opening of The Boardwalk. Two years later, in 2016, TTC worked with RVi Landscape Architects to create the schematic design for additional landscape enhancements and to add exercise equipment to the space.
commemorative bricks
An engraved brick is a great way to honor Trail lovers, friends, family, and pets along the Butler Trail. When you purchase a commemorative brick, you immediately become part of the Trail.
Lakeshore Bricks opened in 2021, with the first wave of installations occurring in the Summer of 2022. The bricks are part of the Lakeshore Exercise Equipment area. Bricks are still available in this area, with bricks installed yearly in the Spring.
